Sign In | Join Free | My entremaqueros.com
China Jiangyin Dingbo Technology Co., Ltd logo
Jiangyin Dingbo Technology Co., Ltd
Jiangyin Dingbo Technology Co.Ltd. Professional in manufacturing roll forming machine
Active Member

10 Years

Home > Cold Roll Forming Machine >

Automatic Cold Roll Forming Machine Door Frame Roll Form Machine

Jiangyin Dingbo Technology Co., Ltd
Contact Now

Automatic Cold Roll Forming Machine Door Frame Roll Form Machine

  • 1
  • 2
  • 3

Brand Name : Shenghong

Model Number : SH16-06-05-04

Certification : ISO9001 and CE

Place of Origin : China, Jiangsu

MOQ : 1 sets

Price : Negotiation

Payment Terms : T/T

Supply Ability : 30 SETS/ MONTH

Delivery Time : 40 days after payment

Packaging Details : Container

Use : door

Production Capacity : 8-10m/min

Power(W) : 15kw

Dimension(L*W*H) : 6.8*0.8*1.2m

Thickness : 0.8-1.2mm

Contact Now

Automatic Cold Roll Forming Machine Door Frame Roll Form Machine
Product Description

Drawing for you reference:

Parameters:

Technical Data & Specification
Productivity Door frame as the drawing
Man Power Required One operator with one assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Number of Stations 18-24 sets
Thickness 0.3-0.8mm
Main Power 15 KW
Shipment Packing one 40 FT container
Forming Speed 20mtr./min(Not include shear)
Line Direction Left to Right While Facing Operator Panel
Overall Machine Length Required 8.5m
Approximate Machine Height 1.5M

Complete Line Consist Of(working process)
Passive decoiler
Infeeding applicator
Roll forming machine unit
Flying saw shear

Output table

After-sale Serive

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)


Product Tags:

rolling forming machine

      

sandwich panel making machine

      
 Automatic Cold Roll Forming Machine Door Frame Roll Form Machine Manufactures

Automatic Cold Roll Forming Machine Door Frame Roll Form Machine Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiangyin Dingbo Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)